Lead Times

Spivvy

Active Member
Nov 21, 2021
269
135
UK
I copied this out of the german web site for lead times from Vw Group
someone posted the link earlier but thought i would just trim for the formentor

Model Build Additonal Build on top of 4 months
Formentor4 months2.0 TSI 140 kW (190 hp) 4-drive 7-speed DSG +3 months
2.0 TSI 180 kW (245 hp) 7-speed DSG +4 months
2.0 TSI 228 kW (310 hp) 4-drive 7-speed DSG +5 months
1.4Te HYBRID 150 kW (204 hp) 6-speed DSG +5 months
1.4Te HYBRID 180 kW (245 hp) 6-speed DSG +6 months
BEATSAudio sound system +6 months
Matt finishes +2 Months
Towing hitch, swiveling with electric unlocking +1 month
Panoramic glass sunroof +1 month
19-inch rims +1 month
 

Spivvy

Active Member
Nov 21, 2021
269
135
UK
I couldn't believe one month for 19 rims they are standard on V2 so makes a build of 5 months plus shipping

Sent from my Pixel 5 using Tapatalk
 

FormentorV2

Active Member
Oct 19, 2021
40
31
I don’t mean to sound ignorant or anything but how has the situation gotten worse over the last few months?
 

Spivvy

Active Member
Nov 21, 2021
269
135
UK
The be fair I don't know how old this is but. I was quoted minimum 4 months from the dealer , hopefully it will improve as Samsung are now supplying chips to cupra factory

Sent from my Pixel 5 using Tapatalk
 

Gordon Blair

Active Member
May 3, 2020
82
95
I copied this out of the german web site for lead times from Vw Group
someone posted the link earlier but thought i would just trim for the formentor

Model Build Additonal Build on top of 4 months
Formentor4 months2.0 TSI 140 kW (190 hp) 4-drive 7-speed DSG +3 months
2.0 TSI 180 kW (245 hp) 7-speed DSG +4 months
2.0 TSI 228 kW (310 hp) 4-drive 7-speed DSG +5 months
1.4Te HYBRID 150 kW (204 hp) 6-speed DSG +5 months
1.4Te HYBRID 180 kW (245 hp) 6-speed DSG +6 months
BEATSAudio sound system +6 months
Matt finishes +2 Months
Towing hitch, swiveling with electric unlocking +1 month
Panoramic glass sunroof +1 month
19-inch rims +1 month
Not sure I would take that guide as gospel, as when I picked up my new VZ2 310 last week after a 7 month wait, the salesman said the VW group dealerships were given new timescales for new cars being built. I was told that if I were to order a VZ2 now, I’d have to wait potentially 12-14 months
 