Good point was expecting more not less!i suspect changes may not be for the better with all the shortages going on. I am build week 22 so looking like i will miss any updates.
Model YearApologies if this is an obvious question but what does “MY” mean?
I have a build week of 22 confirmed but tbh not really expecting to actually see my car until maybe August/September given folks experiences on here
According to a leaked document published on line, due to the ongoing Global supply chain issues, the MY23 will feature analogue instruments, manual aircon, no DSG available, wind-up windows, halogen lighting throughout, a pushbutton radio-cassette player and traditional manually operated handbrake.i suspect changes may not be for the better with all the shortages going on. I am build week 22 so looking like i will miss any updates.
On the plus side we may go back to spare wheels as standardAccording to a leaked document published on line, due to the ongoing Global supply chain issues, the MY23 will feature analogue instruments, manual aircon, no DSG available, wind-up windows, halogen lighting throughout, a pushbutton radio-cassette player and traditional manually operated handbrake.
It will however feature a new design of dynamic indicator:
View attachment 31937
Argghh that is annoying. Did the dealer give this info?Just heard it's going back upto a 12" screen again on the V2 190 (don't know about the rest) from MY 23. I have been told I can reorder for October so going to do that as I didn't want the car until September anyway
i’ve pinged a msg to my dealer (stockport). my bw was 22 but i probs won’t mind it delayed if i can get the bigger screen and a 72 plateYes I emailed them to ask what the changes were and would I get them. Got a call quickly and told it was just the screen change but they would reorder at no cost if I would like to. My original build was next week and I guess they are being so flexible as they can easily sell the original order quickly. I didn’t want it until September anyway so a 1 month delay is fine for me.
Be interesting to hear how you get on. Sure they can sell the current order easy enoughi’ve pinged a msg to my dealer (stockport). my bw was 22 but i probs won’t mind it delayed if i can get the bigger screen and a 72 plate
Well my last interaction with them, they said my BW was 22 and then proceeded to say it would take 4-6 weeks for the car to be fully built. Never realised Cupra were hand making carsBe interesting to hear how you get on. Sure they can sell the current order easy enough