Ok so quite a healthy update since the last one
Had the following done since...
- 185/35 nankang NS2 stretched tyres fitted
- Colour coded front and rear badges
- Yellow filmed front fogs
- Black FMIC Silicone pipe
- Black 4mm Vac hoses for engine bay
- 1 Washer camber (about 1.5 negative degree)
- 20mm Hubscentric rear spacers re-fitted
- Coilovers fullow lowered front and adjusters and cups removed on rear (leaving spring only)
- Wheel centres re-painted in White
- Valve caps replaced with chrome dice)
Only have a few pictures unfortunately, will be getting more once further updates happen (see below)
During Camber adjustment
End result of Camber (can also see stretch and spacer fitment)
Yellow fog and Black FMIC hose
Wheel re-furb in White
As mentioned above im currently undergoing more work, starting to focus on inteior and engine bay, so currently in progress are
- Momo Team 280mm Steering Wheel (just waiting for boss in the post)
- Secondary air system delete to tidy engine bay (waiting on resistors and forge plate in post)
- Coolant and Washer caps colour coded in Black (currently drying)
- TT Pedals (brake and clutch fitted, accelerator to be purchased)
- 5mm Spacers on back to push rears out a tiny bit (still to purchase)
Will get more pictures soon of the overall car and new modifications, let me know your throughts
