Despite SEAT telling me my car had been built, and the
dealer telling me it should be ready to pick up by end of month, the a$$-hats at SEAT UK have now told me my car Is delayed.
It wasnt actually built in its "confirmed" build week of CW31 because of the summer shutdown, even though the factory didnt shut till 11th August, a week after my car was supposed to have been built. Its now being built CW38 (apparently a 2 week shutdown adds 7 weeks to the delay) + shipping/delivery/etc/etc were now looking at October/November.