Right, time for a bit of an update on all things Yellow Beastie
Been a busy ten days or so with mods, breakdown and stage 2 mapping.
Spent a few days ripping into the engine bay. Finished off the battery relocation, old manifold off. Pcv pipe work removed. This was found to have 4 big splits in
So needless to say, this was binned and pipe work for my oil at can run instead. Then it was on with the phenolic gasket I have had sat in the garage for ages. Onto this went my lovely shiny polished manifold and polished throttle body. Looks lovely and bling
The throttle body has had the fitting where the rubber pipe connects at the top tapped for a 1/8th npt thread. So the pipe that used to connect here now runs down and goes to the point under the manifold that is normally blanked off when doing the pcv pipe work delete.
The 1/8th tapping is for a wmi nozzle so that's that sorted when I get the funds for water meth. For now it's just blanked off.
Also at this point, with the battery out the way I was able to replace the jentex filter with a much larger Ramair cone. Next to this I fitted my bracket to hold the fuse box and catch can.
Also fitted at this point were the silicon upper boost hoses and forge map tube.
Few pictures,
Coilovers fitted
Taking it all apart,
Looking a lot better all back together,
Sent from my iPhone using Tapatalk