Got a few bits done on the car today. Not as much as I would have liked but hey ho!
Got the mains cable for my battery relocation laid. Managed to find a smallish grommet just alongside the cabin filter which I have used for the mains cable and then down through the plastic trunking to where the battery was located, so no drilling.
Created all my new earth cables and got everything done wiring wise ready to get the battery into the correct place.
I've got a battery box which I hade made and have put it into the place that I want. Undecided about if I want to be drilling holes into the floor or if I should just tack weld it to the floor. Leaning towards the tack welding at the moment.
Didn't get time to get round to fitting the rARB yet but perhaps next week this should get done. I was going to get the new head unit fitted but my eBay purchases for the adaptor facia haven't turned up yet!
Hopefully my wheels should be here next week, looking forward to getting them fitted. Have taken a deposit for the LCR alloys and have had a few enquiries for the tyres as well.
Going to order a silicone elbow to bring my air filter towards the front of the car and get it into a prime space as behind the battery it wasn't getting the best air flow.
All in all a good day. Back on it next week.