I've got a trip to AMD tomorrow suspension, cambelt, service and most importantly an APR Map.
Now over the past few weeks in preperation I have accumulated a new N75, MAF, Coilpacks and SFS Upper Boost hoses in preperation but just haven't had the time to fit them.
I was thinking if I get down there early enough (also bonus of missing the Queues at the Blackwall tunnel or Dartford Bridge) say 7 will an hour to get these done be enough and is there anything I should know or special tools I need to fit them all (and save £100 in labour).
I do know one end of a spanner from another but not having done the N75 or coilpacks before I just didn't want to get caught out.
Now over the past few weeks in preperation I have accumulated a new N75, MAF, Coilpacks and SFS Upper Boost hoses in preperation but just haven't had the time to fit them.
I was thinking if I get down there early enough (also bonus of missing the Queues at the Blackwall tunnel or Dartford Bridge) say 7 will an hour to get these done be enough and is there anything I should know or special tools I need to fit them all (and save £100 in labour).
I do know one end of a spanner from another but not having done the N75 or coilpacks before I just didn't want to get caught out.