Had a free hour today in between the bad weather..
Managed to tidy up a few things and sort some wiring out Which made it a tad neater or the best i could get it...
Manged to finish the TIP of and finally fit the LCR sensor in the Rs4 maf which was a nice snug fit

..The got cracking on making the Piping up for my GFB bov which was mega easy....as i wasnt expecting that...
So all thats Left todo Is fit Oil & coolant Lines,Actuator,Charge pipe And Cable tie/Jubliee Clip all my hoses up which im currently ordering soon....
Then its on with the downpipe and finally start the key...
Next week il be ordering the Following bits i can think off to get her running :
2x Resistors n249 & n75
Sort Evap out ( talking to Issam about trying a few Resistors)
Order New G12 Coolant
Order peice of 63mm 90 piping with my required length Maybe Bill or Forge ect
T-bolt Clamps Various Sizes
Then its the downpipe ....Thats it finished then i can Mot & Tax it...Theres still clutch and Fuel pump todo yet but that doesnt bother me i just need it drive able
usal quick crap pictures: