ok car is booked in to have my rear arches cleaned up next thursday and friday so when i get it back the car should be spotless
.
also car is booked in at wallace for the 3rd of October. I'm having them take the turbo and everything off as the turbo is getting sent away to be fully refurbed with uprted bearings and seals as the oil seals are gone and there was quite abit of play in the shaft.
The car will be in for a week it will get the downpipe and sports cat sorted so no more rattles or vibrations new top mounts fitted on the coilies as the current top mounts are knackered. full service including coolant timing belt and water pump (i'm biting the bullet and having it all done at once) and once everything is back together a nice stage 2 map (possibly with the sps software depends on the pennies) and a rolling road.
then it will be 2 new front tires and the tracking set up properly as the inside edges on my current tyres are balding.
also car is booked in at wallace for the 3rd of October. I'm having them take the turbo and everything off as the turbo is getting sent away to be fully refurbed with uprted bearings and seals as the oil seals are gone and there was quite abit of play in the shaft.
The car will be in for a week it will get the downpipe and sports cat sorted so no more rattles or vibrations new top mounts fitted on the coilies as the current top mounts are knackered. full service including coolant timing belt and water pump (i'm biting the bullet and having it all done at once) and once everything is back together a nice stage 2 map (possibly with the sps software depends on the pennies) and a rolling road.
then it will be 2 new front tires and the tracking set up properly as the inside edges on my current tyres are balding.